underground power-house
常见例句
- Criterion and damage zone induced by excavation blasting of underground power-house were studied by field test of blasting vibration and numerical simulation.
通過現場爆破振動測試和數值模擬方法研究地下廠房爆破損傷範圍及判據; - In this paper the authors use FLAC3D to carry out simulation analysis in underground power house of Ertan Project. FLAC3D is a three dimensional explicit finite-difference program.
採用三維有限差分FLAC3D程序,以二灘工程地下洞群的結搆形式爲背景,考慮了幾種主要不同因素的影響對圍巖穩定性進行了大量計算工況的準三維數值模擬。 - Excavation of the upper section of a large underground power house carven and blasting vibration control are close-related to the time limit of the project and the cost and construction safety.
特大型地下廠房頂拱層開挖和爆破震動控制,涉及整個工程項目的工期、成本及施工安全,所以一直是施工中的最關鍵工序。 返回 underground power-house