clay dyke
常见例句
- Failure of double layer dyke foundation by seepage first begins from tenacious clay covering.
双层堤基的渗透破坏首先是从黏性土盖层开始的。 - The upstream cofferdam in second period was originally designed as a sand and gravel dyke with clay core.
二期上游围堰原设计为粘土心墙沙砾料堰,经研究修改为覆面式复合土工膜防渗结构石碴堰。 - The geological structure of the dyke base is typical of double layer with sand on the top and clay on the bottom.
堤基地质结构为典型的“上砂下粘”双层结构,地表直接出露粉细砂。 返回 clay dyke