- Practice proved that the option on electromechanical equipment for Letan hydropower station was rational.
实践证明,乐滩水电站机电设备的选型是合理的。 - The article praises the speed and spirit showed in the construction of Letan hydropower station.
摘要文章赞扬乐滩建设速度和乐滩精神。 - Letan hydropower station is river bed type water-retaining power house with a total installed capacity of 600MW and 250t navigation lock scale.
乐滩水电站为河床式挡水厂房,总装机容量600 MW,船闸规模为250 t级。 - Letan hydropower station, with a total installed capacity of 600 MW and a total investment of 4.024 billion Yuan, is one of the important electric supply project in Guangxi in the period of the tenth five-year plan in China.
摘要乐滩水电站工程是国家“十五”期间在广西投产的重要电源建设项目之一,工程总投资40.;24亿元,电站总装机容量600mw。 - The paper introduces the management characteristics on construction project of Letan hydropower station, and dissertates project management framework, standard operation, executive force etc.
摘要介绍乐滩水电站建设项目管理特点,从项目管理架构、规范运作、执行力等方面论述。 - Turbine Installation in Letan Hydropower Station
乐滩水电站水轮机安装 返回 Letan